★北京广利核系统工程有限公司田博川,刘卿,高连国,孙健,张登超,方国辉
摘要:随着控制理论与技术的进步,某核电站项目首次采用数字化技术的后备盘(以下简称:ACP),使其具有更高的集成度和可靠性,为机组安全稳定运行提供更有效的支撑。其网关采用了虚拟实物模拟,Level2层采用实物模拟的方式,并去除参考机组冗余的硬件设备和网络架构,具备仿真精度高、通讯集成度高、设备占用空间小、节约采购成本等优点。ACP仿真技术的首次应用不仅可以提高操作员的培训质量,更能在 日常的课程培训中将一些隐性问题发掘并反馈实体机组。
关键词:核电站;后备盘;ACP
Abstract: With the process of control theory and technology, the backup panel of digital technology (hereinafter referred to as ACP) is adopted for the first time in a nuclear power plant project, which makes it have higher integration and reliability and provides more effective support for the safe and stable operation of the unit. The ACP gateway adopts emulation, and Level 2 adopts stimulation, and eliminates the redundant equipment and network architecture of the reference unit. It has the advantages of high simulation accuracy, high communication integration, small equipment footprint, and saving procurement costs. The application of ACP simulation system can not only improve the training quality of operators, but also discover some hidden problems in daily course training and feedback the actual unit.
Key words: Nuclear power plant;BUP;ACP
在线预览:防城港3&4机组ACP后备盘仿真技术的研究与首次应用.pdf
摘自《自动化博览》2022年第三期